Kerung Kathmandu road

This post is about various routes joining "Kerung-Rasuwagadi Nepal China International border" to Kathmandu.

The Kerung Rasuwagadi border was used for mutual transaction between Nepal and Tibet (China) for hundreds of years. But it was formally opened for bilateral trade in 2014 Dec as the alternative to the Tatopani border. In 2015 earthquake Tatopani border was fully blocked, so Kerung border emerged as the main trading point. In 2017 Aug 30, Keyrung border declared as the international border allowing citizens from third countries to cross as well.


The Kathmandu-Kerung route can be divided into two segments: Kathmandu to Betrawoti, and Betrawoti to Kerung.
Kathmandu Kerung Road

There are three roads available for Kathmandu-Betrawoti segment.

1. Balaju (ring road) - Kakani - Bidur - Betrawoti : 74kms
2. Kalanki (ring road) - Thankot - Galchhi - Bidur - Betrawoti : 80kms
3. Samakhusi (ring road) - Tokha - Sunkhani - Bidur - Betrawoti : 58 kms

Roads available for Betrawoti-Kerung segment: (li)

1. Betrawoti - Dhunche - Syafrubesi (54kms) - Kerung (+15kms)
2. Betrawoti - Mailung - Syafrubesi (31kms) - Kerung (+15kms) along Trisuli, under construction


Train

China completed Lhasa-Shigatse railway in 2014 Aug. Shigatse (Xigazê) is the nearest large Chinese city from Nepal. Shigatse-Kerung border rail line is under construction and expected to complete by 2022.

The proposed Kerung-Kathmandu railway will be about 100kms long and travel time will be about an hour. This train line will be 85% underground. This project is the part of OBOR and its estimated cost is about USD 2.5bn. (li)


See Also
  1. Madhya Pahadi Lokmarga
  2. Hulaki Rajmarga 
  3. Kathmandu-Nijgadh Fast Track
Tags: Betrawati, Betrabati, keyrung, Kyirong, Gyirong Town (吉隆镇),